Levees and Floodwalls: Line the Culvert. Don’t Replace It.

Address failing culverts in dams, levees and floodwalls cost-effectively without compromising structural integrity.

A no-dig solution that’s faster and less costly.

Infrastructure integrity is a critical factor in decisions related to levee and floodwall maintenance operations. When culvert repair, rehab or replacement is required, more and more, the Army Corps of Engineers and levee sponsors are turning to the economical, efficient no-dig solution — the Snap-Tite® HDPE lining system.

The Snap-Tite culvert lining system is ideal for levee and floodwall applications, providing the ability to rehab the existing culvert with minimal disturbance, maintaining the integrity of the levee or floodwall.

Levees and Floodwalls
  • Utilizes durable, flexible high-density polyethylene (HDPE) pipe with male/female machined joints “snapped” together for secure, watertight connections
  • Meets ASTM D3212 requirements, as well as AASHTO M 326 standard specification for pipe lining and UFGS specification requirements
  • In most cases, the rehabilitated culvert will have the same or greater flow than the old culvert
  • More economical with longer life than other culvert rehabilitation options
  • Available in 8"–63" round sizes, including oval culvert applications to fit existing arch, elliptical and rectangular box configurations

FEMA Hazard Mitigation Grant Program

Download our Snap-Tite Levees and Floodwalls brochure